Copperfield Nature Trails Workday05/17/2008 As it get close to summer it gets too hot to have greenbelt workdays along Walnut Creek, but the Copperfield Nature Trails Group has a few fun tasks on their to do list before the heat comes. The current workday agenda includes:
Plant mountain laurel and native plums and maybe a few other plants.
Dig holes and reset two trail markers in concrete so the vandals can't pull them out again
Dig holes and install two posts and piece of lattice to support cross vines we planted along the storm drain.
A few areas of the main trail on the way to Yager need someone to take a pick axe to the ruts left by the 4wheelers to smooth the trail.
Mow and weed whack along the "scenic loop" trail and the trail at the Shropshire entrance.
Whack a 1 inch stump out of the trail somewhere near Shropshire (I trip over it when I run, but then I can't find it on workdays!)
A few areas along the fence line trail need to be widened by lopping back the cedar branches.
Date: May 17th Time: 9am-12pm (noon)Location: dead-end of Blakeney Lane (NE Austin – 78753) Contact: copperfield-trails@austin.rr.com or 835-2401